Offshore wind park Westermost Rough officially inaugurated

For the first time, Siemens has installed the 6 MW direct drive wind turbine with a rotor diameter of 154 meters on a commercial large scale project.

Today, the offshore wind power plant Westermost Rough was officially inaugurated. Consisting of 35 Siemens wind turbines, each with a capacity of 6 megawatts and a rotor diameter of 154 meters, this project is the first to use these turbines on a large scale in a commercial project.

Owner is a joint venture between DONG Energy (50%) and its partners Marubeni Corporation (25%) and the UK Green Investment Bank (25%). With a capacity of 210 megawatts, Westermost Rough will be capable of meeting the annual electricity demands for more than 150,000 British households.

The Westermost Rough offshore wind power plant is situated 8 kilometers off the British east coast. The Siemens scope of supply for this project covered the delivery and the commissioning of the direct drive wind turbines. Turbine installation was carried out using the purpose-built installation vessel Sea Challenger which is owned by A2SEA, a joint venture between DONG Energy and Siemens.

“This is the first time Siemens has installed the 6 MW direct drive turbine with a 154 meter diameter rotor on a commercial-scale project,” said Michael Hannibal, CEO Offshore at the Siemens Wind and Renewables Division. “The Westermost Rough project reinforces our wide-ranging experience in offshore wind and is leading the way to bring the costs of offshore wind energy down.”

Siemens is responsible for all scheduled and unscheduled service and maintenance on the turbines at Westermost Rough for the first 5 years through a wind technician team comprised of 50% Siemens and 50% Dong Energy personnel. The 6 MW wind turbines have an integrated helicopter-hoisting platform at the rear of the nacelle which allows easy and safe access for service technicians.

At Westermost Rough helicopters will be used to bring the service technicians to the wind turbines. Siemens' offshore wind service and maintenance operations offer the latest in innovative concepts and safety logistics designed to provide optimal efficiency and reliability. Remote monitoring and diagnostics, along with Siemens' expert service personnel, will combine to support the offshore turbines at Westermost Rough and help ensure the units are operating at optimal levels at all times.

For further information on Division Wind Power and Renewables, please see: www.siemens.com/wind

Siemens AG (Berlin and Munich) is a global technology powerhouse that has stood for engineering excellence, innovation, quality, reliability and internationality for more than 165 years. The company is active in more than 200 countries, focusing on the areas of electrification, automation and digitalization. One of the world's largest producers of energy-efficient, resource-saving technologies, Siemens is No. 1 in offshore wind turbine construction, a leading supplier of combined cycle turbines for power generation, a major provider of power transmission solutions and a pioneer in infrastructure solutions as well as automation, drive and software solutions for industry. The company is also a leading provider of medical imaging equipment – such as computed tomography and magnetic resonance imaging systems – and a leader in laboratory diagnostics as well as clinical IT. In fiscal 2014, which ended on September 30, 2014, Siemens generated revenue from continuing operations of €71.9 billion and net income of €5.5 billion. At the end of September 2014, the company had around 343,000 employees worldwide on a continuing basis.

Further information is available on the Internet at www.siemens.com

Reference Number: PR2015070275WPEN

Contact
Ms. Eva-Maria Baumann
Wind Power and Renewables Division
Siemens AG

Freyeslebenstr. 1

91058 Erlangen

Germany

Tel: +49 (9131) 18-3700

eva-maria.baumann​@siemens.com

All latest news from the category: Corporate News

Back to home

Comments (0)

Write a comment

Newest articles

Superradiant atoms could push the boundaries of how precisely time can be measured

Superradiant atoms can help us measure time more precisely than ever. In a new study, researchers from the University of Copenhagen present a new method for measuring the time interval,…

Ion thermoelectric conversion devices for near room temperature

The electrode sheet of the thermoelectric device consists of ionic hydrogel, which is sandwiched between the electrodes to form, and the Prussian blue on the electrode undergoes a redox reaction…

Zap Energy achieves 37-million-degree temperatures in a compact device

New publication reports record electron temperatures for a small-scale, sheared-flow-stabilized Z-pinch fusion device. In the nine decades since humans first produced fusion reactions, only a few fusion technologies have demonstrated…

Partners & Sponsors