Inadequate software interoperability in the capital facilities industry cost the commercial, institutional and industrial building sectors $15.8 billion in 2002 in lost efficiency, according to a newly released study commissioned by the National Institute of Standards and Technology (NIST).
Conducted by RTI International (Research Triangle Park, N.C.) and the Logistics Management Institute (McLean, Va.), the report places a price tag on avoidance, mitigation and delay activities due to data-exchange problems. It also takes into account the cost of redundant paper management.
The analysis, expected to benefit key stakeholders throughout the construction industry, breaks down data exchange-related losses for architects and engineers, general contractors, specialty fabricators and suppliers, and owners and operators at three different stages of a building’s life:
(1) design and engineering;
(2) construction; and
(3) operations and maintenance.
John Blair | Source: EurekAlert!
Further information: www.nist.gov
www.bfrl.nist.gov/oae/oae.html
More articles from
Information Technology:
Innovative search for world’s biggest physics laboratory
08.10.2008 | Fraunhofer-Institut fuer Graphische Datenverarbeitung IGD
World’s biggest computing grid launched
07.10.2008 | DOE/Brookhaven National Laboratory
Scientists find new insight into genome of neglected malaria parasite
10.10.2008 | Life Sciences
Hodgkin lymphoma -- new characteristics discovered
10.10.2008 | Life Sciences
Digital zebrafish embryo provides the first complete developmental blueprint of a vertebrate
10.10.2008 | Life Sciences