Inadequate software interoperability in the capital facilities industry cost the commercial, institutional and industrial building sectors $15.8 billion in 2002 in lost efficiency, according to a newly released study commissioned by the National Institute of Standards and Technology (NIST).
Conducted by RTI International (Research Triangle Park, N.C.) and the Logistics Management Institute (McLean, Va.), the report places a price tag on avoidance, mitigation and delay activities due to data-exchange problems. It also takes into account the cost of redundant paper management.
The analysis, expected to benefit key stakeholders throughout the construction industry, breaks down data exchange-related losses for architects and engineers, general contractors, specialty fabricators and suppliers, and owners and operators at three different stages of a building’s life:
(1) design and engineering;
(2) construction; and
(3) operations and maintenance.
John Blair | Source: EurekAlert!
Further information: www.nist.gov
www.bfrl.nist.gov/oae/oae.html
More articles from Information Technology:
Siemens develops a video solution to uncover leaks in an industrial environment
20.11.2009 | Siemens AG
‘Fingerprinting’ RFID Tags: Researchers Develop Anti-Counterfeiting Technology
20.11.2009 | University of Arkansas, Fayetteville
Scientists Unravel Evolution of Highly Toxic Box Jellyfish
20.11.2009 | Life Sciences
When good companies do bad things: Examining illegal corporate behavior
20.11.2009 | Business and Finance
UCR plant scientist's research spawns new discoveries showing how crops survive drought
20.11.2009 | Agricultural and Forestry Science
Multidisciplinary meeting on Urological Cancers aims to benefit cancer patients
20.11.2009 | Event News
'Golden Age' for clinical psychology in Northern Ireland
20.11.2009 | Event News
New Perspectives in Marine Anti-Fouling Research
11.11.2009 | Event News